Thoughts on the evaluation indicators of effectiveness of environmental impact assessment system in China
-
摘要:
中国环评制度备受关注,亦饱受争议。如何客观看待一项制度,其有效性是重要的判定依据。环评有效性体现在制度建设、制度执行和发挥效力全过程,具有多个维度的内涵。围绕经济、社会、环境可持续发展目标,从制度有效性、程序有效性、实质有效性和认知有效性4个维度,按照“制度基础→实践过程→发挥作用→社会认知”逻辑,探索构建了中国环评制度有效性评估框架,并结合中国环评制度设计和运行模式,提出了一套科学、适用,兼具可操作和灵活性的中国环评有效性评估指标,为客观系统看待中国环评制度提供了思路,也为建立中国环评制度有效性跟踪评估机制提供参考,支撑环评制度改革优化。
Abstract:Environmental impact assessment (EIA) system of China has attracted considerable attention and controversy. When judging a system, it is important to consider its effectiveness objectively. The effectiveness of EIA is reflected in the entire process of system construction, system implementation, and taking effects, with multidimensional meaning. Aming at sustainable development of economy, society and environment, an evaluation framework of China's EIA system was explored and constructed based on the logic chain of "institutional basis→practical process→taking effects→social cognition", from four aspects of system effectiveness, procedural effectiveness, substantial effectiveness and cognitive effectiveness. Combined with the EIA system design and implementation mode of China, a set of scientific and applicable effectiveness evaluation indicators, with both practicality and flexibility, were proposed. These could provide ideas for objective and systematic assessment of China's EIA system, as well as reference for the establishment of a mechanism for tracking evaluation of the effectiveness of China's EIA system and for supporting its reform and optimization.
-
表 1 环评制度有效性评估指标
Table 1. Indicators for evaluating the effectiveness of EIA system
一级指标 二级指标 三级指标内容 制度有效性 规则完整 法律、法规、部门规章、管理文件;技术导则/技术指南/技术要点;管理机构及管理责任;技术机构及人员队伍和技术水平 程序清晰 纳入管理的规划、建设项目范围;分级管理规定、审查审批流程;各方责任和义务;与其他环境管理制度的衔接机制 与时俱进 纳入管理的规划、建设项目范围的调整;分级管理规定、审查审批流程等管理程序上的优化;评价内容和技术
方法更新和完善程序有效性 依法执行 建设项目环评、规划环评执行率 质量可靠 程序的遵守,即环评早期介入、信息公开、公众参与;环评文件质量,即评价方法适用、结论科学可信、缓解措施可行 成果落实 规划调整建议在规划中的采纳情况;规划实施过程环评各项措施要求的落实;建设项目“三同时”执行情况 实质有效性 转变发展
方式协调跨区域跨流域发展和系统保护;合理开发规模和开发时序;优化产业结构;推动行业清洁生产水平;促进循环经济发展;引导环保投资和科技创新 优化开发
格局引导产业集聚化发展;缓解或避免
人居矛盾;重要生态空间保护治理保护
措施环境基础设施;污染防治措施;生态影响减缓/修复措施;主要污染物减排措施;
环境风险防控措施认知有效性 环境意识 市场主体环境意识、社会公众环境
意识和参与能力社会影响 各利益主体、社会公众的了解和认可程度 环境权益 公众知情权、参与权、监督权保障 -
[1] 李海生, 李小敏, 赵玉婷, 等.基于文献计量分析的近40年国内外环境影响评价研究进展[J]. 环境科学研究,2022,35(5):1091-1101.LI H S, LI X M, ZHAO Y T, et al. Environmental impact assessment research in domestic and foreign literature in past four decades based on scientometric reviews[J]. Research of Environmental Sciences,2022,35(5):1091-1101. [2] 金自宁.我国环评否决制之法理思考[J]. 中国地质大学学报(社会科学版),2019,19(2):11-22. doi: 10.16493/j.cnki.42-1627/c.2019.02.002JIN Z N. Legal oberservations on China's EIA veto system[J]. Journal of China University of Geosciences (Social Sciences Edition),2019,19(2):11-22. doi: 10.16493/j.cnki.42-1627/c.2019.02.002 [3] ORTOLANO L, JENKENS B, ABRACOSA R P. Speculations on when and why EIA is effective[J]. Environmental Impact Assessment Review,1987,7(4):285-292. doi: 10.1016/0195-9255(87)90002-3 [4] BARKER A, WOOD C. An evaluation of EIA system performance in eight EU countries[J]. Environmental Impact Assessment Review,1999,19(4):387-404. doi: 10.1016/S0195-9255(99)00015-3 [5] FISCHER T B. Strategic environmental assessment performance criteria: the same requirements for every assessment[J]. Journal of Environmental Assessment Policy and Management,2002,4(1):83-99. doi: 10.1142/S1464333202000905 [6] 林逢春, 陆雍森.中国环境影响评价体系评估研究[J]. 环境科学研究,1999,12(2):8-11. doi: 10.3321/j.issn:1001-6929.1999.02.002LIN F C, LU Y S. Evaluation of the environmental impact assessment system in China[J]. Research of Environmental Sciences,1999,12(2):8-11. doi: 10.3321/j.issn:1001-6929.1999.02.002 [7] 宋国君, 马中, 姜妮.环境政策评估及对中国环境保护的意义[J]. 环境保护,2003(12):34-37. doi: 10.3969/j.issn.0253-9705.2003.12.008SONG G J, MA Z, JIANG N. Environmental policy assessment and its significance in environmental protection in China[J]. Environmental Protection,2003(12):34-37. doi: 10.3969/j.issn.0253-9705.2003.12.008 [8] 毛渭锋, 李巍.环境影响评价有效性评估理论研究[J]. 云南环境科学,2004,23(4):30-33.MAO W F, LI W. Research on theory of efficiency assessment of environmental impact assessment[J]. Yunnan Environmental Science,2004,23(4):30-33. [9] 徐鹤, 王会芝.新常态下我国规划环境影响评价有效性问题探析[J]. 环境保护,2015,43(10):24-26. doi: 10.14026/j.cnki.0253-9705.2015.10.003XU H, WANG H Z. Study on the effectiveness of PEIA under the background of new normal[J]. Environmental Protection,2015,43(10):24-26. doi: 10.14026/j.cnki.0253-9705.2015.10.003 [10] 范顺利, 郭苏, 武朋飞.基于AHP-模糊综合评价法的规划环境影响评价有效性研究[J]. 环境科学与管理,2017,42(7):176-179. doi: 10.3969/j.issn.1673-1212.2017.07.041FAN S L, GUO S, WU P F. Study on effectiveness of planning environmental impact assessment based on AHP-fuzzy synthetic evaluation method[J]. Environmental Science and Management,2017,42(7):176-179. doi: 10.3969/j.issn.1673-1212.2017.07.041 [11] 陈胜杰. 规划环境影响评价有效性的评价[D]. 天津: 天津大学, 2020. [12] 张勇, 杨凯, 王云, 等.环境影响评价有效性的评估研究[J]. 中国环境科学,2002,22(4):324-328. doi: 10.3321/j.issn:1000-6923.2002.04.010ZHANG Y, YANG K, WANG Y, et al. Studies on evaluating environmental impact assessment effectiveness[J]. China Environmental Science,2002,22(4):324-328. doi: 10.3321/j.issn:1000-6923.2002.04.010 [13] 尹民, 杨志峰.深圳市环境影响评价有效性评估[J]. 安全与环工程,2004,11(4):5-8.YIN M, YANG Z F. Evaluation of environmental impact assessment effectiveness of Shenzhen City[J]. Safety and Environmental Engineering,2004,11(4):5-8. [14] 周丹平, 孙荪, 包存宽, 等.规划环境影响评价项目实施有效性的评估[J]. 环境科学研究,2007,20(5):66-71. doi: 10.13198/j.res.2007.05.68.zhoudp.011ZHOU D P, SUN S, BAO C K, et. al. The evaluation for effectiveness of planning environmental impact assessment program[J]. Research of Environmental Sciences,2007,20(5):66-71. doi: 10.13198/j.res.2007.05.68.zhoudp.011 [15] 金国华, 崔朋, 刘嘉, 等.吉林省建设项目环境影响评价有效性研究[J]. 长春工程学院学报(自然科学版),2017,18(1):86-92.JIN G H, CUI P, LIU J, et al. The research on the effectiveness of environmental impact assessment during the construction project in Jilin Province[J]. Journal of Changchun Institute of Technology (Natural Sciences Edition),2017,18(1):86-92. [16] 宋国君, 杨靖然, 刘宇欣.涉及生物多样性保护的环境影响评价有效性评估[J]. 环境污染与防治,2012,34(7):93-100. doi: 10.3969/j.issn.1001-3865.2012.07.020 [17] 黄蕊, 李巍, 韩宇.基于典型案例的流域规划环评管理成效评估[J]. 中国环境科学,2021,41(7):3409-3417. doi: 10.3969/j.issn.1000-6923.2021.07.046HUANG R, LI W, HAN Y. A performance evaluation based on typical cases of environmental impact assessment of watershed development plans[J]. China Environmental Science,2021,41(7):3409-3417. doi: 10.3969/j.issn.1000-6923.2021.07.046 [18] 王会芝, 徐鹤, 吕建华, 等.中国战略环境评价实施现状及有效性研究: 基于统计分析的调查研究[J]. 环境污染与防治,2010,32(9):103-106. doi: 10.3969/j.issn.1001-3865.2010.09.025 [19] 李天威, 赵立腾, 徐鹤, 等.五大区重点产业发展战略环境评价有效性研究[J]. 未来与发展,2015,39(11):44-49. doi: 10.3969/j.issn.1003-0166.2015.11.010LI T W, ZHAO L T, XU H, et al. Effectiveness research on the SEA of key industries' development in the five-mega regions[J]. Future and Development,2015,39(11):44-49. doi: 10.3969/j.issn.1003-0166.2015.11.010 [20] 胡璇, 李丽丽, 栾胜基.中国环评制度的独特运行机制探讨[J]. 环境科学研究,2012,25(9):1065-1070. doi: 10.13198/j.res.2012.09.110.hux.018HU X, LI L L, LUAN S J. Comparative politics analysis of the unique EIA mechanisms in China[J]. Research of Environmental Sciences,2012,25(9):1065-1070. doi: 10.13198/j.res.2012.09.110.hux.018 [21] 陈一远. 制度的有效性及其影响因素研究[D]. 济南: 山东大学, 2016. [22] 冉庆凯, 栾胜基.环境影响评价有效性的制度特征分析[J]. 环境保护,2005,33(13):17-19. doi: 10.14026/j.cnki.0253-9705.2005.13.005RAN Q K, LUAN S J. Analysis of system characteristics of environmental impact assessment effectiveness[J]. Environmental Protection,2005,33(13):17-19. doi: 10.14026/j.cnki.0253-9705.2005.13.005 [23] JAY S, JONES C, SLINN P, et al. Environmental impact assessment: retrospect and prospect[J]. Environmental Impact Assessment Review,2007,27(4):287-300. doi: 10.1016/j.eiar.2006.12.001 [24] LYHNE I, van LAERHOVEN F, CASHMORE M, et al. Theorising EIA effectiveness: a contribution based on the Danish system[J]. Environmental Impact Assessment Review,2017,62:240-249. doi: 10.1016/j.eiar.2015.12.002 [25] BINA O, JING W, BROWN L, et al. An inquiry into the concept of SEA effectiveness: towards criteria for Chinese practice[J]. Environmental Impact Assessment Review,2011,31(6):572-581. doi: 10.1016/j.eiar.2011.01.004 [26] LOOMIS J J, DZIEDZIC M. Evaluating EIA systems' effectiveness: a state of the art[J]. Environmental Impact Assessment Review,2018,68:29-37. doi: 10.1016/j.eiar.2017.10.005 [27] GEIßLER G, REHHAUSEN A, FISCHER T B, et al. Effectiveness of strategic environmental assessment in Germany: meta-review of SEA research in the light of effectiveness dimensions[J]. Impact Assessment and Project Appraisal,2019,37(3/4):219-232. [28] 郑欣璐, 包存宽.环评改革应着力提升有效性[J]. 环境保护,2016(5):33-36. [29] 王会芝. 中国战略环境评价的有效性研究[D]. 天津: 南开大学, 2013. [30] 冉庆凯, 栾胜基.环境影响评价有效性研究综述[J]. 生态经济,2013,29(8):165-167. doi: 10.3969/j.issn.1671-4407.2013.08.035RAN Q K, LUAN S J. A review of effectiveness of environmental impact assessment[J]. Ecological Economy,2013,29(8):165-167. doi: 10.3969/j.issn.1671-4407.2013.08.035 [31] RETIEF F P, FISCHER T B, ALBERTS R C, et al. An administrative justice perspective on improving EIA effectiveness[J]. Impact Assessment and Project Appraisal,2020,38(2):151-155. doi: 10.1080/14615517.2019.1680042 [32] REGA C, SINGER J P, GENELETTI D. Investigating the substantive effectiveness of strategic environmental assessment of urban planning: evidence from Italy and Spain[J]. Environmental Impact Assessment Review,2018,73:60-69. doi: 10.1016/j.eiar.2018.07.004 [33] 汪守东, 徐洪磊, 程金香, 等.长江经济带内河港口规划环评成效及对策[J]. 环境影响评价,2019,41(6):33-37. doi: 10.14068/j.ceia.2019.06.008WANG S D, XU H L, CHENG J X, et al. Study on the effectiveness and countermeasures of inland port planning EIA in the Yangtze River Economic Zone[J]. Environmental Impact Assessment,2019,41(6):33-37. doi: 10.14068/j.ceia.2019.06.008 [34] 冉庆凯, 栾胜基.基于SSP范式的环境影响评价有效性研究[J]. 生态经济,2013,29(7):163-166. doi: 10.3969/j.issn.1671-4407.2013.07.035RAN Q K, LUAN S J. Study on effectiveness of environmental impact assessment based on "state-structure-performance" (SSP)[J]. Ecological Economy,2013,29(7):163-166. doi: 10.3969/j.issn.1671-4407.2013.07.035 [35] REHHAUSEN A, KÖPPEL J, SCHOLLES F, et al. Quality of federal level strategic environmental assessment: a case study analysis for transport, transmission grid and maritime spatial planning in Germany[J]. Environmental Impact Assessment Review,2018,73:41-59. doi: 10.1016/j.eiar.2018.07.002 [36] NAKWAYA-JACOBUS D N, HIPONDOKA M, ANGOMBE S, et al. Evaluating the performance and procedural effectiveness of Namibia's environmental impact assessment system[J]. Environmental Impact Assessment Review,2021,91:106670. doi: 10.1016/j.eiar.2021.106670 [37] REHHAUSEN A. The art of underperforming SEA: symptomatic narratives from Germany[J]. Environmental Impact Assessment Review,2019,78:106280. doi: 10.1016/j.eiar.2019.106280 [38] 包存宽, 许艺嘉, 王珏.关于新时期环境影响评价“放管服”改革的思考[J]. 环境保护,2018,46(9):7-11. doi: 10.14026/j.cnki.0253-9705.2018.09.002BAO C K, XU Y J, WANG J. On the reform of environmental impact assessment in the new period[J]. Environmental Protection,2018,46(9):7-11. ⊗ doi: 10.14026/j.cnki.0253-9705.2018.09.002